Back to Services

Building Entrance Approval

Building entrance and access approval — driveway, kerb, and connection design coordinated with ITC and the municipality for safe, compliant access.

Building Entrance Approval

We design and secure approval for building entrances and access connections, coordinating driveway, kerb, and road-connection design with ITC and the municipality.

01

Access & Driveway Design

Design of safe, compliant vehicle and pedestrian access to your building.

  • Driveway design
  • Vehicle access geometry
  • Pedestrian access
02

Kerb & Road Connection

Kerb crossing and road-connection design coordinated with the existing road.

  • Kerb crossing design
  • Road connection detail
  • Sight-line & safety check
03

Authority Coordination

Coordination with ITC and the municipality for entrance and access approval.

  • ITC coordination
  • Municipality submission
  • Standards compliance
04

Approval & Follow-up

Securing the entrance approval and following up until the permit is issued.

  • Submission preparation
  • Comment resolution
  • Approval follow-up

What Our Building Entrance Service Delivers

We design compliant building access and secure the entrance approval — coordinating the driveway, kerb, and road connection with ITC and the municipality.

  • Vehicle and pedestrian access design
  • Driveway and entrance geometry
  • Kerb crossing and road-connection design
  • Sight-line and access safety checks
  • Coordination with ITC and the municipality
  • Compliance with access and road standards
  • Submission drawings and technical reports
  • Approval follow-up until the permit is issued
Get a Free Quote

How We Deliver Your Approval

Building entrances that connect to a public road require ITC and municipality approval. We design the access and follow up each submission until the permit is issued.

1

Consultation & Scoping

We review your project, identify every required approval and design deliverable, and give you a clear roadmap with timelines and costs.

2

Design & Documentation

Our engineers prepare drawings, calculations, and technical reports to the exact standards required by the relevant Abu Dhabi authorities.

3

Authority Submission

We submit through the correct portals — ITC, IDAS, DMT, and others — and manage every reference, fee, and revision cycle on your behalf.

4

Follow-up & Revisions

We actively track each submission, respond to technical comments, and resolve queries quickly to keep your project moving.

5

Approval & Handover

Once approved, we collect the stamped drawings, permits, and certificates and hand them over ready for construction.

Frequently Asked Questions

Approval is required whenever a building's entrance or driveway connects to a public road — including new access points, modified entrances, and kerb crossings.

Entrance and access connections are typically approved by ITC and the municipality. We prepare the design to their standards and coordinate the approval on your behalf.

It includes the driveway and access geometry, kerb crossing, road-connection detail, and sight-line and safety checks, with the drawings and reports required for submission.

Yes. We can review a rejected or stalled application, correct the design to meet the authority comments, and follow up until the entrance approval is issued.

Need Building Entrance Approval?

Contact us today for a free consultation. Our experts will assess your requirements and give you a clear roadmap from design to final approval.